| Well, dont take option H for new school, and please don't be surprised if there is no major renovation within the 10 years. If option H is not chosen, they should still move some Churchill kids to wootton, and nearby crown kids ( like wootton, Gaithersburg, and Quince Orchard) should fill up Crown HS. The budget for mcps is stretch already, I still think that the board will pick Option H ultimately maybe with some minor changes. |
The problem with North Potomac homes being assigned to QO in the past with that QO would’ve definitely been overcrowded at times. It’s definitely a small school and should be expanded when renovated. To the second point that Potomac clan going to Churchill, I grew up in the area in the 90s and there was a lot of changes between men and Churchill clusters due to at the time being severely overcrowded so Potomac Glen was built and added in Churchill instead of going to, I believe Lakewood and Wootton. It’s really shocking how much of a decline in enrollment Wooten has experienced since the 90s. I think it’s like 500 kids potentially from its peak. I went there about 25 years ago and it was definitely a much larger enrollment. |
I don’t think they can realistically go forward with H if it’s clear the community as a whole has been against it. It’s an obvious majority against it at this point and their whole thing is “our choices are based on community feedback”. I really believe they need to publish the feedback after it’s collected for this round and be transparent. Because if they do ended up going forward with H without the support of the community majority I really can’t imagine they won’t lose the little trust they already have left. |
The board will likely decide to save $300M and go with the holding school options, if Wootton is effective in rejecting option H. Why in the world would they create all the chaos involved in A-D AND spend $300M more? That's insane. |
Wootton is being offered a brand new building and has tons of course offerings. Many schools don't even have 1/3 of what they have. And, yet, we should go without so W school parents can be happy? |
| If i am wootton teachers, j would be happy to get a new building, better work environment to teach. 3 miles is nothing, and crown is at a convenient location for driver. |
My comment on addition at Wootton was in regards to doing a renovation on site. The way the current school is sited and the rest of the land on which it sits, it doesn’t permit for a very large addition which would allow them to work on renovating the rest of the school a section at a time and eventually demolishing another area of the school to use as a field. I think when Churchill was renovated in like 1998-2001 they started with a very large addition which held a lot of students. This let them demolish another existing area of the school (became parking lot to replace the parking that existed where the addition was built) and then they worked on wings of the school renovating one section at a time while students used the new addition and other non-renovated areas of the school, then the newly renovated area opened and a non-renovated area closed to be renovated. What I’m saying is that process isn’t possible at Wootton which means a holding school is required in order to renovate the school. This is why it’s never been done. Then the question becomes does it make sense to spend $400M on a high school nearby a brand new high school when the county wide excess seats will be more than 5000 at the HS level and there are so many other needs in the county. Closing Damascus isn’t an option given its location, Magruder would be a challenge too. So because of the poor decision to build Crown which was made at a time when it seemed it would be needed, unfortunately logically it makes the most sense to close Wootton and add some money to fix some key areas and use it as a holding school. There are so many secondary schools that need renovations in the coming decade and having a holding school will be essential. If we had unlimited money and were in a good economic situation sure rebuild Wootton but the reality is we are not. |
|
I think that closing Wootton is a no brainer, how can we justify that cost and we get a new school much sooner than any other option.
My kids go to Lakewood and Frost, so we’re fairly close, it’s not a big deal if they keep us intact. One other point to think about is that if Wootton is closed and moved to Crown, there are several ways to expand capacity in the future without rebuilding Wootton that will be far more cost effective. For example when QO is renovated/replaced, it should be expanded to a capacity closer to 2,000-2,200. Churchill and RM could get 200-250 seat additions. The QO project will need to happen in the next 15-20 years. So at that point there’s not a significant added cost to building it a bit larger. Two additions to Churchill and RM can likely be done for 25-35% of the cost of fully replacing Wootton. Then you have operating cost savings from having slightly larger schools (less admin salaries for example). Finally this could help with geography in the future by say moving Cold Spring resident students to Churchill (closer than Crown) or Travilah/Dufief to QO. Crown has the option to expand in the future and that could accommodate the current Wootton plus fields road plus growth in the area. Finally there are so many elementary schools that are way underutilized, just in Wootton and Churchill clusters alone nearly ever ES is way underutilized. Given most Wootton schools are pretty old, I’d expect closure of at least one vs replacing. The sites will be available in the future should it be warranted to be needed again. |
Wootton had a large addition back in 2000 too. It’s just the original building part which never got any renovation. You can’t treat Wootton differently from other schools. Damascus Magruder can have a rebuild but Wootton cannot because of economic situation. Why not moving the other two? |
There was talk of closing Cold Spring ES because of how underenrolled it was. I heard the PTA asked MCPS if they could have the Horizon Hill neighborhood go to to CS, and of course, the answer was No. Quite honestly, they should just close that school. |
Magruder has some far more serious issues as do other schools. |
Either way, I don’t think option H is viable for the such strong opposition from Wootton cluster. MCPS will most likely not push against the whole community and force them to relocate with a boundary process which doesn’t have even sound legal. Let’s focus on other options. |
Do the other two have an already-built, brand new building in reasonably close proximity presenting reasonable facility utilization across the system as an option? |
Of course it is. They demanded a new building and are getting it. |
So you feel that they should keep SSIMS open and rehabilitate it just like Wootton, right? |