It always feels like here that the moment some group doesn't like a change, even if it would be better for all, out come the T-shirts and signs and lawsuits. It's a wonder anything gets done. If everything is a special interest, nothing is special. It's always the loudest group wins. I almost feel bad for the APS staff. Almost. |
I'm old enough to remember when Montessori said they were ok moving into an old building and didn't need a fancy new space. Well, that didn't age well. |
What I meant was that the bond capacity was maxxed out with the existing plan for Montessori/AT/career center. I guess they could get some of that back if they change the plan. |
why is it too late? Drew never filled up. They have space. |
That's because MPSA wanted to get away from Drew. Back then, Drew was being run like a prison camp while MPSA was its affluent school within a school. |
Yes I know that MPSA wanted to get away from Drew. Oh well. |
Moving MPSA to the old ACC is in the current CIP and no bond capacity isn't close to its max in the current CIP. If they change the plan now, they will increase costs and waste time in finishing the ACC site with a plan the community supported. They'll lose bond capacity in the process and delay later projects (like Taylor). You'd have to renovate Nottingham if you wanted to move MPSA there and increase its capacity and change boundaries across north Arlington. Nottingham is smaller than MPSA. Changing the plan is costly and controversial. Why would the board want to do that? |
Since APS disposed of its planning department, they would have to spend money on out-of-state consultants and a public process that would last the better part of a year. I think that’s why APS is looking to use Langston for swing space, even if they haven’t said so publicly. That plan, if true, entails keeping Nottingham open as a neighborhood school for now. The era of boundary changes may be over—for the next few years. I’m even doubting APS will spend time and money on the proposed high school boundary changes that were supposed to coincide with the opening of the new Arlington Tech building. That process should have started this year. And I guess the Ashlawn/Yorktown families are still happy they get automatic/guaranteed neighborhood transfers into W-L. They are the only Arlington neighborhood with a guaranteed choice of two high schools for all four years. I’m beginning to think that the current crop of Syphax/APS decision-makers would rather not mess with boundaries again if they can avoid doing so. They have probably observed the boundary change struggles over at FCPS and MCPS this past year. |
| Why do they get guaranteed transfers? |
Because the neighborhood didn't want to be reassigned to Yorktown from W-L. And the school board promised them they would be reassigned back to W-L when the W-L expansion was completed. Since that never happened, APS has allowed this option between Yorktown and W-L to remain in place, at least until the next comprehensive high school boundary changes happen. But that looks increasingly unlikely. |
I expect the planning team to pop up as those consultants, after forming an LLC. Then they are just outside of the system. |
Montessori currently has 515 kids enrolled and Nottingham's permanent capacity is 513. Also, as an option school, Montessori can easily control their enrollment. There is no way to draw boundaries including walk zones to fill all of the schools on the western edge of the county with neighborhood kids. There is nowhere in the county 10 miles from Notthingham. Did you research any of this before you starting typing? |
This is the weirdest argument that keeps getting repeated. A renovated career center will not be a fancy new space. Have you seen the building? APS should be happy that MPSA wants it. Otherwise it will remain empty. No other school or program will want to be there and the building will sit empty. |
Yes I have seen the building. I recall Montessori saying they'd be ok anywhere including their current location. But now that's not good enough. Move them back to Drew, there's space. |
|
There isn’t enough money to properly fix Swanson and TJ so finding money to renovate Taylor isn’t gonna happen.
|