| How can you tell a coach who to play. |
You don’t. The coach off a roster. |
With any luck, that will not happen if FCPS pulls it together and makes this school and surrounding community come together |
|
Opening a new school not physically designed for FCPS class sizes, figuring out sports and other extracurricular activities kids need as ECs on college applications, etc., require logistics and planning. Skills not evidenced to date by Reid or the crack team at Gatehouse.
Look for more no bid spending on contractors who don’t have a clue to help out. Wonder if these schools will have bathroom facilities and locker rooms for those transitioning genders? |
| Reid has f’ed this up beyond repair. This school will struggle for years due to how they’ve started it. |
I’m with you on that completely and have no idea as to how they will do it if they do it at all as these people show no ability to do meaningful things. |
LOL! There is no legal cause of action for a kid not being selected for a team, or not played. |
I'm honestly stumped as to how, logistically, a kid gets from Woodlawn to Wakefield to make the bus that has to be in Herndon by 4:00. Woodlawn apparently doesn't get out until 3:50 pm. Wakefield is out at 3:10. Does Arlington send one bus to pick up one kid who leaves class early at Woodlawn, and transports him to Wakefield? Then when the freshman bus returns from Herndon at some point, is there a bus waiting just for him to take him back to Woodlawn? It makes no sense. |
They can do cobstruction with students in the building, just like they did with WSHS. It was a little bit inconvenient, but no big deal. |
It is not that hard. They did it with 2500 students present at WSHS. The construction crews wall off the section they are working on, closing or opening one zone at a time as they start or complete each section. Other than traffic patterns changing (with plenty of advance notice) it really was not that difficult for students. This campus is in MUCH better shape than WSHS, with far less extensive updates needed. The process should go very smoothly and quickly, especially if they hire a strong contractor like the one who renovated WSHS. |
| Kids go to school during construction all the time. DS was at Fox Mill while it was under construction, it wasn’t a big deal. |
True, but they had organized phases and quads provided. With this project, they will use the two buildings across the street as academic work space possibly, and it shouldn’t be as involved as what Fox Mill underwent. |
|
ARL Tech and HB Woodlawn are programs not schools. Diplomas are from the geographic in boundary HS. Like if a student gets transport to an academy in FCPS but isn't there full time un like Edison global stem. ARL Tech gets hub transportation and end time is 10-15 minutes earlier than the comprehensive schools so it's 3 bus routes for those interested in VHSL sports, theatre productions-Wakefield, Washington-Liberty, Yorktown. https://www.arlingtonmagazine.com/arlington-tech-high-school-aps/#:~:text=Arlington%20Tech%20isn't%20a,be%20in%20a%20bigger%20school.%E2%80%9D |
| Yeah I can see them ending Westerns day earlier so they can be bussed. The school is new, the issue is it was for K-12. The elementary area is scaled down (bathrooms etc) so they need to renovate it. |