Anonymous wrote:OP here. Thanks everyone for the feedback.
We are not stingy at all. AP's bedroom and bathroom are in the basement and those areas will not be impacted. We are renovating the kitchen on the first floor and putting on a small addition off of the kitchen area as well. We have worked with this contractor before. The addition would be done first with most of the work taking place outside initially. Contractor said that real impact to kitchen is 6 weeks. They will work around the kitchen and get other work done before that.
We have a second fridge and sink and kitchen cabinet set up in the basement. I suspect we will be using paper plates, microwave, the bbq grill a lot. Probably lots of take-out too. We plan on going on vacation and taking AP with us for two weeks while the kitchen is out of commission.
Hi OP,
I would tell the AP all of this, when you interview. Full disclosure is always better. If your dream candidate will be put off by the renovation, then she was not the right fit for your family.
Good luck, OP! It sounds like you have a good plan.