Anonymous
Post 02/20/2012 06:46     Subject: Poolesville High School

Anonymous wrote:
Anonymous wrote:Then the site is wrong.

I worked there when the entire building was modernized. Most of the building was gutted and redone with major departments being relocated for long periods of time (except for the gym, auditorium and parts of the science wing). Library was moved and changed from 2 stories to 1.

There also was an addition put on at the same time.

A later addition was added a few years after.




Maybe you need to step away from the pipe. Are you sure that you were at Magruder?


Ignoring your insult. Yes.
Anonymous
Post 02/19/2012 08:42     Subject: Poolesville High School

Anonymous wrote:Then the site is wrong.

I worked there when the entire building was modernized. Most of the building was gutted and redone with major departments being relocated for long periods of time (except for the gym, auditorium and parts of the science wing). Library was moved and changed from 2 stories to 1.

There also was an addition put on at the same time.

A later addition was added a few years after.




Maybe you need to step away from the pipe. Are you sure that you were at Magruder?