Anonymous
Post 12/04/2020 13:16     Subject: VDOT spending $1.7 million in Clifton Bypass study

Anonymous wrote:VDOT should spend that money studying an extension of the Yellow line down to Mt. Vernon and Hybla Valley.


We don't have the population density to support the two stations WMATA would want to build. WMATA still can't figure out how a station in Potomac Yards would be useful.
Anonymous
Post 12/03/2020 14:32     Subject: VDOT spending $1.7 million in Clifton Bypass study

I think a wall around Clifton would make a lot more sense than a bypass. Wall them up, and keep them there.
Anonymous
Post 11/30/2020 09:17     Subject: VDOT spending $1.7 million in Clifton Bypass study

Anonymous wrote:VDOT should spend that money studying an extension of the Yellow line down to Mt. Vernon and Hybla Valley.


There about 10,000 other projects VDOT should study before a so-called Clifton bypass.
Anonymous
Post 11/29/2020 20:20     Subject: VDOT spending $1.7 million in Clifton Bypass study

VDOT should spend that money studying an extension of the Yellow line down to Mt. Vernon and Hybla Valley.
Anonymous
Post 11/29/2020 18:14     Subject: VDOT spending $1.7 million in Clifton Bypass study

I really hope they construct interchanges
Anonymous
Post 11/29/2020 15:27     Subject: VDOT spending $1.7 million in Clifton Bypass study

Anonymous wrote:
Anonymous wrote:What are they bypassing? What major route runs through Clifton?


Lol. The major SECONDARY route 645, which everyone just calls Clifton Road.


That goes nowhere in either direction before it hits a major road. The bypass has already been built. There are two called Fairfax County Parkway and Route 28.
Anonymous
Post 11/28/2020 16:12     Subject: VDOT spending $1.7 million in Clifton Bypass study

Anonymous wrote:What are they bypassing? What major route runs through Clifton?


Lol. The major SECONDARY route 645, which everyone just calls Clifton Road.