Anonymous wrote:Anonymous wrote:These "foundation to keys in four months" stories seem impossible. I've never seen a custom project take less than a year. I mean, acclimating the flooring to the conditioned space ought to take a couple of months, and isn't happening while the drywall is off-gassing the moisture, and that's months after the wall close in is done so the HVAC is turned on.
It does not take a couple of months to acclimate floors.
Anonymous wrote:Anonymous wrote:If you paid $82K for your lot, you -- at best -- live in an exurb. You may be able to put up a house for $1.4M. You are not paying the close in premium for everything from workers, to permits, to lot clearance, dumpsters, landscaping, painting -- even cleaning .
How much do you think it costs to build a house? The builders are selling them for $2.2 on a close in lot they bought for $1m. It doesn't cost them anywhere near $1.4 to build!
Anonymous wrote:These "foundation to keys in four months" stories seem impossible. I've never seen a custom project take less than a year. I mean, acclimating the flooring to the conditioned space ought to take a couple of months, and isn't happening while the drywall is off-gassing the moisture, and that's months after the wall close in is done so the HVAC is turned on.
Anonymous wrote:These "foundation to keys in four months" stories seem impossible. I've never seen a custom project take less than a year. I mean, acclimating the flooring to the conditioned space ought to take a couple of months, and isn't happening while the drywall is off-gassing the moisture, and that's months after the wall close in is done so the HVAC is turned on.
Anonymous wrote:These "foundation to keys in four months" stories seem impossible. I've never seen a custom project take less than a year. I mean, acclimating the flooring to the conditioned space ought to take a couple of months, and isn't happening while the drywall is off-gassing the moisture, and that's months after the wall close in is done so the HVAC is turned on.
Anonymous wrote:Anonymous wrote:Anonymous wrote:OP here--first clarification. In the realm of custom homes, going with a design-build firm that has builder, architect, permitting,and even the lot purchase in house is the generally the most expensive way to go. Lining up the architect, builder, etc saves money comparatively.
A move in ready home will definitely save on stress, but then of course you're not getting exactly what you want. And as far as total cost, an existing 5500 sq ft, 5 br/4.5 bath, 2 car garage home will run 800k-2M, depending on location. Compared to an existing build, similar specs in Bethesda, we'll be saving money. Compared to an existing build in Fredericksburg, for example, we'll be spending more.
One reason we're building: we have a family member who uses a wheelchair and I was finding it impossible to find universal access. By the time we looked at sinking 75-100K into making a home truly disability friendly, it made sense to build.
Here was how we found the lot: our budget meant that we skipped the close-in mo-co areas, where a sliver of a lot is going for over 300K, and that's if you're lucky. We wanted the following: good school district with diversity (we have young kids), convenient location for hybrid work for commutes into DC 2-3 times/week, if possible, existing sewer/water hookups, and 1/3 to a half acre. We found our lot that met all of these specs by setting up search parameters on Redfin, and purchased it back in 2020. Total cost: 82K
Okay so by somewhere in the DMV region you mean nowhere close to DC.
OP you don’t need to disclose the town or neighborhood but can you say how many miles away from DC are we talking about? A small teardown lot in close-in desirable suburbs would often be $500-700k+ so I presume if you paid $82k you must be out somewhere near Hagerstown out by the Pennsylvania border? (For example https://redf.in/O878ZV)
Anonymous wrote:Anonymous wrote:OP here--first clarification. In the realm of custom homes, going with a design-build firm that has builder, architect, permitting,and even the lot purchase in house is the generally the most expensive way to go. Lining up the architect, builder, etc saves money comparatively.
A move in ready home will definitely save on stress, but then of course you're not getting exactly what you want. And as far as total cost, an existing 5500 sq ft, 5 br/4.5 bath, 2 car garage home will run 800k-2M, depending on location. Compared to an existing build, similar specs in Bethesda, we'll be saving money. Compared to an existing build in Fredericksburg, for example, we'll be spending more.
One reason we're building: we have a family member who uses a wheelchair and I was finding it impossible to find universal access. By the time we looked at sinking 75-100K into making a home truly disability friendly, it made sense to build.
Here was how we found the lot: our budget meant that we skipped the close-in mo-co areas, where a sliver of a lot is going for over 300K, and that's if you're lucky. We wanted the following: good school district with diversity (we have young kids), convenient location for hybrid work for commutes into DC 2-3 times/week, if possible, existing sewer/water hookups, and 1/3 to a half acre. We found our lot that met all of these specs by setting up search parameters on Redfin, and purchased it back in 2020. Total cost: 82K
Okay so by somewhere in the DMV region you mean nowhere close to DC.
Anonymous wrote:If you paid $82K for your lot, you -- at best -- live in an exurb. You may be able to put up a house for $1.4M. You are not paying the close in premium for everything from workers, to permits, to lot clearance, dumpsters, landscaping, painting -- even cleaning .
Anonymous wrote:We built a custom home in DE 7 years ago using a design/build firm. It worked well and took about 4 months between ground breaking and handing over the keys.
Our relatives, who built on an adjacent lot, acted as their own GC (they've done it many years before, so not total novice). They started around the same time as us, but did not finish until 3 years later. I have no idea if they saved much money after all, but the headaches were next level.