Anonymous wrote:Anonymous wrote:7 feet depending on where you are is fine. We just pulled a basement permit. Lowest for ducts is 6.4 feet.
Basement ceiling height shall not be less than 7 feet above the finished floor. Structural members spaced 4 feet or more apart may project up to 6 inches below the required ceiling height.
Anonymous wrote:7 feet depending on where you are is fine. We just pulled a basement permit. Lowest for ducts is 6.4 feet.
Anonymous wrote:OP, we aren't handy enough for DIY. We have a contractor who gave us an estimate to finish the basement but at that point we weren't thinking about whether or not to do a bathroom. I'll probably have him come back and look at the possibility of adding a bathroom and get a new estimate. I'm not sure what the plumbing situation is -- we do have a bathroom directly above the basement so not sure if that is helpful.
Anonymous wrote:A rough in for pipes should be fairly easy given everything is unfinished. It can be a DIY job if you are handy, but otherwise should be $2-3k max. I would definitely add the bath.
Anonymous wrote:A rough in for pipes should be fairly easy given everything is unfinished. It can be a DIY job if you are handy, but otherwise should be $2-3k max. I would definitely add the bath.