Anonymous wrote:Anonymous wrote:On the other hand, when I've looked at $1m+ new construction houses, the finishes are still builder grade. I remember at open houses seeing bathroom vanities with drawers already off the tracks in houses never lived in. If you were remodeling your existing, you'd never put in that crap. The windows are vinyl with the muntins inside the glass. Kitchen cabinets don't reach the ceiling, etc. All the interior doors came off the rack from Home Depot or wherever. Driveways are just poured. That's what you get if you're trying to do new construction at that low of a budget. Quantity of space over quality of finishes.
Sounds better than your 50s shit shack rambler
Anonymous wrote:On the other hand, when I've looked at $1m+ new construction houses, the finishes are still builder grade. I remember at open houses seeing bathroom vanities with drawers already off the tracks in houses never lived in. If you were remodeling your existing, you'd never put in that crap. The windows are vinyl with the muntins inside the glass. Kitchen cabinets don't reach the ceiling, etc. All the interior doors came off the rack from Home Depot or wherever. Driveways are just poured. That's what you get if you're trying to do new construction at that low of a budget. Quantity of space over quality of finishes.
. Sorry to hijack!Anonymous wrote:http://www.newdimensionsinc.com/ProductsGrid.asp?ProductSeriesID=EST&FormProducts_Sorting=5&FormProducts_Sorted=5&
Anonymous wrote:Our friends did it a couple years ago for $350k, nice, big, but basement unfinished.