Toggle navigation
Toggle navigation
Home
DCUM Forums
Nanny Forums
Events
About DCUM
Advertising
Search
Recent Topics
Hottest Topics
FAQs and Guidelines
Privacy Policy
Your current identity is: Anonymous
Login
Preview
Subject:
Forum Index
»
VA Public Schools other than FCPS
Reply to "MPSA - new school or move to north Arlington?"
Subject:
Emoticons
More smilies
Text Color:
Default
Dark Red
Red
Orange
Brown
Yellow
Green
Olive
Cyan
Blue
Dark Blue
Violet
White
Black
Font:
Very Small
Small
Normal
Big
Giant
Close Marks
[quote=Anonymous][quote=Anonymous][quote=Anonymous][quote=Anonymous][quote=Anonymous][quote=Anonymous][b]The existing CC building has to be renovated after the new HS is built. That will cost tens of millions of dollars. $40? $50?[/b] APS is not talking about that yet. MPSA is going to be torn down. You could leave it on the site during construction, then renno, then move it to the old building. But that takes at least 5 years, and it also means the construction for the new building will be much harder and stupider, because they will spend $1 million building MPSA a new play area they plan to destroy, and they will build a half field instead of a full field, and the bus loop won't be optimized, etc. They absolutely should move MPSA north now. It doesn't matter where, we have the seats, use them. Make the construction make more sense now. Then in 5 years when you are renovating the old building, we will know what we need it for. It may be another neighborhood school in S Arlington, where they are building new multi-story family buildings at a crazy pace. Or if north Arlington has some magical growth they could move MPSA back at that point. That's what makes the most sense. I don't know what MPSA actually wants. [/quote] APS had proposals that said the expansion of the Career Center would be around $170-200 million for what they want. [/quote] This has all been very hard to follow. But APS is spending $170-200 million on a brand new building. The existing building will be left on the site, and needs to be renovated for some other purpose when CC moves out. That cost is probably $40-60 million IN ADDITION TO the $170-200 million for the new building. Plus whatever it costs to tear down MPSA, which won't be much. But again, if we are tearing MPSA down anyhow, and we have 500 empty ES seats now (which we do) we should just move MPSA now and figure out later on what to do with the old CC space. I don't think MPSA has to go there, and by that time, we may need a new ES in SA.[/quote] Nope. We don’t need to spend any more $$ right now. They can sit tight in the building we just spent a couple million on for another 5 years or so. It’s not like they’re tearing it down now. It’s years away. Also, this is in the same walk zone as Fleet so this isn’t where we might need a new ES in South Arlington. [/quote] Why would it cost money to move them? We just need to do boundary adjustments, and then we basically have an empty ES in North Arlington, right? If we keep them onsite during construction, we dump another million into that site to move the MPSA playground which we now know is going to get torn down in a few years. Plus, keeping them means we build the bus lane and small field now, and then later on we tear that all up and do it again with the full site. So much wasted $. And yes, it's close to Fleet, but have you seen the housing plans on Columbia Pike? There are 4-5 new multi-story buildings being built within blocks of there.[/quote] +1 This phased approach to the CC and MPSA ultimately costs FAR more money because of the temporary construction pieces that will be re-done a few years later. Ridiculous. They just need the numbers to be lower so they can justify moving forward, rather than comprehensively planning and redeveloping the site thoughtfully like they should. Of course, Arlington in general isn't keen on comprehensive planning and thoughtful development.[/quote]
Options
Disable HTML in this message
Disable BB Code in this message
Disable smilies in this message
Review message
Search
Recent Topics
Hottest Topics