Toggle navigation
Toggle navigation
Home
DCUM Forums
Nanny Forums
Events
About DCUM
Advertising
Search
Recent Topics
Hottest Topics
FAQs and Guidelines
Privacy Policy
Your current identity is: Anonymous
Login
Preview
Subject:
Forum Index
»
Real Estate
Reply to "Evergreene Homes"
Subject:
Emoticons
More smilies
Text Color:
Default
Dark Red
Red
Orange
Brown
Yellow
Green
Olive
Cyan
Blue
Dark Blue
Violet
White
Black
Font:
Very Small
Small
Normal
Big
Giant
Close Marks
[quote=Anonymous]I greatly appreciate your comments and they could not have been said any better. The onsite project manager was no where to be found ( I think he was taking a few days off) when the foundation was poured. The framing crew that came in several days after the foundation was poured to install the floor joists and panelized wall quickly knew they had a problem with the foundation. We had a detached garage and the plans called for a 12 foot ceiling from the top of the slab to the ceiling. The subcontractors were left unsupervised and the garage ended up being 14 feet from the top of the slab to the ceiling. I observed one day as I was visiting the job site that the concrete folks were cutting openings in the wrong locations. Those cuts had to be patched three times. Luckily we were getting a stone veneer water table that would cover up the mess. The only supervisory review I have seen is the marking and correction of warped studs. There really was no reason to rush the framing and concrete work as it took 17 weeks to get the windows. There has been only minimal supervision of the subcontractor work.[/quote]
Options
Disable HTML in this message
Disable BB Code in this message
Disable smilies in this message
Review message
Search
Recent Topics
Hottest Topics