Toggle navigation
Toggle navigation
Home
DCUM Forums
Nanny Forums
Events
About DCUM
Advertising
Search
Recent Topics
Hottest Topics
FAQs and Guidelines
Privacy Policy
Your current identity is: Anonymous
Login
Preview
Subject:
Forum Index
»
Real Estate
Reply to "Massive home addition causes confusion in Fairfax County neighborhood"
Subject:
Emoticons
More smilies
Text Color:
Default
Dark Red
Red
Orange
Brown
Yellow
Green
Olive
Cyan
Blue
Dark Blue
Violet
White
Black
Font:
Very Small
Small
Normal
Big
Giant
Close Marks
[quote=Anonymous][quote=Anonymous][quote=Anonymous][quote=Anonymous][quote=Anonymous][quote=Anonymous][quote=Anonymous]They failed another wind bracing inspection on 2/13. There are a number of problems, and the remarks on the inspection really highlight how shoddy and haphazard this project is. Measuring is not their strong suit. The stop work order is still in effect. Inspection notes: "-House wrap needs to be removed to allow for full inspection. Upper floor almost entirely covered. -Nail pattern incorrect in various locations. CS-WSP panels to be 6" on center on edge and 12" on center in field. CS-PF panels to be 3" on center at edge and 6" on center in field. -Several sheets not fully nailed and separating from structure behind. -Missing anchor bolts at interior braced wall panels. -Various top and bottom plates notched at strong walls. -Incorrect bolt/threaded rod installed at strong walls. -Missing blocking under center and each end between the 2 stories of strong walls at both ends. -Missing various fasteners in strong walls. -Will also need to provide protection for DWV pipe in exterior wall 1st floor -Strong walls do not currently match details on plans or Simpson product catalog. After discussion with Simpson Strong-Tie they have confirmed that they have no installation guide for a scenario like this where the strong walls are installed after the wood framing of the walls has been completed and the foundation has been poured. An engineered design will be needed for the use of the strong walls to include all relevant details. A plan revision will be needed, and the design will also need to be submitted to Simpson Strong-Tie for review in addition to the county review. -Need full reinspection. Contractor/individual performing work must be on site for next inspection. -In addition to wind bracing notes, it was noticed that hallway widths by stairs are currently only 35 inches and will need to be 36 inches at final when finished. "[/quote] Wowwwww. There's no way the manufacturer will be clearing this janky installation. This inspector was pissed and wants to correct the builder to their face next time. Yikes.[/quote] The length makes that look a lot worse than it is. Many of those things are both structurally significant and sloppy, but not necessarily that hard to address. Still, it isn't good that some of those things are still after the last inspection. I wonder if the builder and homeowner are confused about what sort of things they're able to address during a stop-work order. It's a little unclear from the report, but it sounds like the holdowns weren't installed correctly- missing and/or in the wrong place. They don't need the manufacturer to do anything. They need an engineer to tell them where to put other anchors. That's not uncommon for additions.[/quote] The inspector did request that whatever plan an engineer comes up with to be submitted for review to Simpson and then be considered by the County. I am not sure how strict the requests of the inspector are, but this is still a significant complication as it adds further review and another plan amendment (as well as more costs). I have no doubt that the homeowner will be able to find someone to come up with a report justifying the work in place, however it is unlikely that Simpson will even offer an opinion on the review as they are under no obligation to do so. If they did offer an opinion for some reason, there is no deadline that they are compelled to adhere to. Realistically, I could see them saying we have an approved installation process (which this does not conform with) and we stand by that process alone. The lack of an opinion from Simpson, or one that declines to endorse a favorable engineering report, may (not will) impact the review board’s decision process. There are too many errors and deviations from the plan to be accidental. I think it is fair to call the structural integrity of this addition into question. Poor workmanship passes inspections all the time, but due to the Homeowner’s self-created issues, the inspectors are applying a much greater level of scrutiny (rightly so in my opinion) and it appears they will not let anything slide…as they say, “them’s the breaks”. Nevertheless, this project is going to be remaining in regulatory purgatory for the foreseeable future and will continue to atrophy in place. The zoning matter is the albatross in all of this. Resolution of this matter is tied into the original work stoppage. Although there is a BZA hearing in April, that will not be the end of the zoning process as the BZA’s decision is almost certainly going to be appealed to the circuit court by the non-prevailing party. Given how unique and major this issue has become, the Circuit Court will almost certainly hear a valid appeal, and then any decision it makes will likely be appealed to the Virginia Supreme Court. At least for the county’s sake, it is out of their hands after the BZA hearing and they have no liability or obligations once it makes it to the courts. Well let me rephrase, it is out of their hands until they have to issue a demolition permit and enforce it...if it gets to that point… [/quote] i didn't see any metal walls, so I've been assuming the reference to Simpson Strong-Tie is for their holdowns. In that case, it seems far more likely they'd install other holdowns. Unless only a few were installed incorrectly.[/quote] It's not just hold downs. If you refer to Drawing S-10 (page 10 of 18) on the building plans, they are using Simpson Steel Strong Wall Panels. Both Garage Portal Systems on Concrete Foundation, and Two-Story Stacked on Concrete Foundations. If you don't have the full plans (or any other reader here), they are available on Accela. Look up the Zoning amendment for the address and the documents are amiable under "attachments" selection on the drop down. https://www.strongtie.com/products/lateral-systems/strong-wall-shearwalls/steel-strong-wall/shearwalls/steel-installation-standard-application-concrete-foundations https://www.strongtie.com/sswkits_steelstrongwallshearwalls/ssw2_kit/p/steel-strong-wall-two-story-stacked-wall-connection-kit[/quote] I am sure a few screws and nails will fix the current issues. The inspector is being picky. /s Amusingly, I counted four stories in the structure. I will boldly assume Simpson supports building an additional two stories on their stacked two story stacked wall system. [/quote]
Options
Disable HTML in this message
Disable BB Code in this message
Disable smilies in this message
Review message
Search
Recent Topics
Hottest Topics