Toggle navigation
Toggle navigation
Home
DCUM Forums
Nanny Forums
Events
About DCUM
Advertising
Search
Recent Topics
Hottest Topics
FAQs and Guidelines
Privacy Policy
Your current identity is: Anonymous
Login
Preview
Subject:
Forum Index
»
Montgomery County Public Schools (MCPS)
Reply to "Woodward Auditorium Construction Advocacy Ahead of Monday County Council Meeting"
Subject:
Emoticons
More smilies
Text Color:
Default
Dark Red
Red
Orange
Brown
Yellow
Green
Olive
Cyan
Blue
Dark Blue
Violet
White
Black
Font:
Very Small
Small
Normal
Big
Giant
Close Marks
[quote=Anonymous][quote=Anonymous][quote=Anonymous][quote=Anonymous][quote=Anonymous]Northwood is getting a new and larger building. Kennedy just got a larger building. Their space will alleviate Blair's overcrowding, and probably some of Wheaton's and Einstein's. Woodward is reopening as a new building. Its space will alleviate WJ's overcrowding and probably the rest of Wheaton's and Einstein's. BCC and Whitman are in the study too to allow for additional options that may make things work better. [/quote] Look at the projections (currently to 2029-30): WW/BCC/WJ Capacity 6992 Enrollment 7359 (367 over capacity, or 5%) Blair/Northwood/Kennedy Capacity 7308 Enrollment 7302 (6 under capacity, or 0%) Einstein/Wheaton Capacity 3839 Enrollment 4756 (917 over capacity, or 24%) This includes new Northwood capacity but not Woodward. And WJ has all the overage in the first set -- WW & BCC remain under capacity (and could take on some small amount of shift). And Blair has all the overage in the second set, while both Wheaton and Einstein are over in the third. This is versus current catchments. Even to get to that enrollment = capacity for the middle three, you'd need to bus large numbers past Blair and up to Northwood, shifting some of Northwood to Kennedy. And that's with none of the overage from Einstein & Wheaton -- all that Northwood & Kennedy capacity is used already. This means large portions of Einstein and Wheaton will need to go to Woodward or shift to BCC, presuming Woodward naturally assumes more of the existing WJ catchment than needed to alleviate WJ's overcrowding. Possibly even some of the lower Northwood and Blair catchments to even out the enrollment vs. capacity once Woodward's 2160 comes online after Northwood moves out (the additional 540 might come online in a later phase, now, if funded). That's 882 seats across 8 high schools in 2029-30, and we know that the DCC is likely to continue growing faster than WW/BCC/WJ after the current projection timeline, so there might be greater shifts than some anticipate. Unless the Ws keep up the pressure, of course. Then we'll have the expected: overcrowded DCC and under capacity Ws, with no solution for inside-the-beltway/east of the MARC tracks.[/quote] Why is it expected that Ws will be under capacity and DCC over when Woodward is being built to relieve overcrowding at WJ AND DCC? Isn’t that why there will be a massive boundary study involving all these schools? Woodward is not going to be just for WJ students. Current DCC students will go there too[/quote] Given the distance it's doubtful that a lot of DCC students will go. Maybe the Town of Kensington and those more toward Rockville, but otherwise, no. Its probably the W under capacity as they are getting two new schools.[/quote] It'll be like dominoes. For example, you move a lot of WJ and some of Wheaton to Woodward, some of Whitman to WJ, some of BCC to Whitman, some of Einstein to BCC, some of Einstein to Northwood, some of Blair to Northwood, some of Northwood to Kennedy. [/quote]
Options
Disable HTML in this message
Disable BB Code in this message
Disable smilies in this message
Review message
Search
Recent Topics
Hottest Topics